Mastick Road Connector Trail
The Mastick Road Connector Trail is a new 10' wide all-purpose, shared use path to connect the city of Fairview Park to Rocky River Reservation and its larger trail network. The connector trail provides access to more than 3,700 residents who live within one mile, as well as link Fairview Park’s civic center, library, and several schools, to this important regional asset.
The trail provides access from approximately the intersection of Eaton and Mastick Roads into the reservation to the intersection of Valley Parkway and Mastick Road. The trail was built in two segments to bookend a side-hill bridge replacement that was constructed by the Cuyahoga County Department of Public Works in 2021. The bridge was designed with an integrated, separated trail on its downhill side in anticipation of the trail project request.
Project Type: All Purpose Trail Project
Opening Date: April 25, 2024
Contact: Sara Byrnes Maier, Principal Planner, 216-635-3289 or
[email protected]
Project Size: 2,400 linear feet
Contracting Partner(s): Schirmer Construction
Consulting Partner(s): LJB Inc., EL Robinson Engineering, OHM Advisors
Partners: